Skip to content

Frequently asked questions

Straight answers on siting, design, timelines, permitting, cost, liners, renovation, and turning a new lake into a trophy fishery.

Can you build a lake on my property?

In most cases, yes. The honest answer starts with the site. We look at soils, the watershed feeding the site, and where a dam wants to sit before we tell you what your property can support. If the ground won't hold water on its own, we'll say so and design around it (see liners below). The first step is an on-site assessment, not a sales pitch.

What does the design process look like?

An open and honest discussion with our team to get to know your vision is most typically the first step. Next, an evaluation of the watershed allows us to suggest shape and size. That, along with an understanding of soil consistencies, allows us to build a scope and budget to share.

How long does a lake build take?

It depends on the site, the size of the dam, permitting, and weather windows for moving dirt. After the on-site assessment we give you a stage-by-stage schedule: design, any permitting, clearing, dam and basin work, lining if needed, and first water. We'd rather give you a real schedule for your site than a generic number.

Do I need a permit to build a pond or lake in Texas?

Sometimes. It depends on the size of the impoundment, where the water comes from, and whether a stream or regulated waterway is involved. We identify what applies to your site during design and handle the permitting process where it's required.

What determines what a build costs?

Understanding the watershed and any supplemental water sources allows us to determine the appropriate size of your lake, as well as the required dam and spillway design. A thorough soil evaluation helps determine the composition of the lake bottom and the best approach to creating a reliable, watertight basin. Together, these key factors define the project scope and provide the foundation for an accurate project budget.

Will my pond hold water, or do I need a liner?

That's a soils question, and we answer it before construction, not after. Where the site needs help, we recommend the liner material honestly and install it as part of the build. We also diagnose and remediate leaks on existing ponds.

Can you renovate an existing pond or a tired property?

Yes. Renovation covers silted-in basins, leaking dams, overgrown banks, and lost access, for the water and for the land around it. We can keep maintaining the property after it's restored.

Do you work on the land beyond the water?

Yes. Ranch and farm landscape design, selective clearing, grading, roads, pads, drainage, and sightlines. We build the whole rural retreat, not just the lake at the middle of it. We serve Texas, Oklahoma, Arkansas, and Louisiana.

What happens after the build?

All of our lakes are designed with legacy management in mind. Our lakes are handed over to our sister company Lochow Ranch for setting goals and visions. Stocking is sequenced properly, water chemistry gets baselined, and ongoing management keeps the investment performing.

Can you turn my new lake into a trophy-bass fishery?

That's the point of building it right. Our Texas A&M-trained fisheries team surveys by electrofishing, writes a data-driven stocking and harvest plan, and paces the fishery over real growing seasons. Built, stocked, and managed by one team.

Permit requirements for a Texas pond or lake depend on the size of the impoundment, the dam height, and whether the site draws from or crosses a regulated waterway, so they vary property to property. For general reference, the Texas Commission on Environmental Quality regulates surface water rights and maintains a Dam Safety Program. We check what applies to your specific site during design; this is general information, not a permitting determination for your property.

Every build starts with a site visit

Tell us about your property and what you want to build.